Please use this identifier to cite or link to this item: http://lib.kart.edu.ua/handle/123456789/1290
Full metadata record
DC FieldValueLanguage
dc.contributor.authorБерестов, Ігор В’ячеславович-
dc.contributor.authorШаповал, Ганна Василівна-
dc.contributor.authorМерзлякова, Наталія Володимирівна-
dc.contributor.authorBerestov, Igor-
dc.contributor.authorShapoval, Ganna-
dc.contributor.authorMerzlyakova, Nataliya-
dc.date.accessioned2019-06-19T08:33:05Z-
dc.date.available2019-06-19T08:33:05Z-
dc.date.issued2015-
dc.identifier.citationБерестов І. В. Підвищення ефективності взаємодії станції примикання та під’їзних колій / І. В. Берестов, Г. В. Шаповал, Н. В. Мерзлякова // Збірник наукових праць Українського державного університету залізничного транспорту. - 2015. - Вип. 156. - С. 68-73.uk_UA
dc.identifier.issn1994-7852 (print); 2413-3795 (online)-
dc.identifier.urihttp://lib.kart.edu.ua/handle/123456789/1290-
dc.description.abstractUA: У роботі проведено аналіз існуючих досліджень, присвячених підвищенню ефективності взаємодії станції примикання і під’їзних колій. Для графічного відображення взаємозв’язку між проблемою і причинами її виникнення запропоновано використовувати діаграму Ісікави. Причинами, які впливають на ефективність взаємодії, є безпека технологічних процесів, скорочення простою вагонів, збереження ресурсів, узгодженість у роботі, якість управління. Запропоновано розглядати задачу підвищення ефективності взаємодії як багатокритеріальну, а для її рішення застосовувати метод згортання критеріїв.uk_UA
dc.description.abstractEN: Raise of efficiency of interaction of stations of contiguity and secondary railways demands search of new solutions. In activity the analysis of existing mathematical models, the modern automated control systems of a manufacturing process, used schemes of interaction of stations of contiguity and secondary railways is carried out. For graphical display of interrelation between problem and reasons of its origin it is offered to use the chart of Isikavy. She allows to map graphical cause and effect interrelation between problem and the reasons which influence it, simple and convenient in application. The reasons which influence efficiency of interaction, security of manufacturing processes, wagon demurrage reduction, preserving of a resources, a coherence in activity, quality of control are. Each of the reasons on the chart of Isikavy is detailed on components depending on their importance for achievement of definitive result. For raise of efficiency of interaction it is necessary to consider simultaneously a considerable quantity of factors. Therefore it is offered to consider a task of raise of efficiency of interaction as multicriteria. For its solution it is necessary to use a method of folding of criteria. He allows to form from several local criteria one with usage of weighting coefficients which consider importance of each separate criterion. The solution received as a result of optimisation of such criterion, it is possible to consider effective.-
dc.publisherУкраїнський державний університет залізничного транспортуuk_UA
dc.subjectстанція примиканняuk_UA
dc.subjectпід’їзні коліїuk_UA
dc.subjectефективність взаємодіїuk_UA
dc.subjectдіаграма Ісікавиuk_UA
dc.subjectбагатокритеріальна задачаuk_UA
dc.subjectметод згортання критеріївuk_UA
dc.subjectcontiguity stationuk_UA
dc.subjectsecondary railwaysuk_UA
dc.subjectefficiency of interactionuk_UA
dc.subjectthe chart of Isikavyuk_UA
dc.subjecta multicriteria taskuk_UA
dc.subjecta method of folding of criteriauk_UA
dc.titleПідвищення ефективності взаємодії станції примикання та під’їзних колійuk_UA
dc.title.alternativeImproving the efficiency of the interaction of station of contiguity and secondary railwaysuk_UA
dc.typeArticleuk_UA
Appears in Collections:Випуск 156

Files in This Item:
File SizeFormat 
Berestov.pdf300.49 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.